It's one of the most common requests I get: “Nobody uses the tub — can you turn it into a walk-in shower?”
Short answer: yes, and it's one of the best upgrades you can make to a bathroom. Longer answer: it's a bigger job than most people expect, because of one thing hiding under the floor. Let me walk you through what actually happens.
Why people make the switch
- The tub sits unused. Most households shower daily and bathe rarely — the tub becomes a laundry hamper with plumbing.
- Getting in and out gets harder. Climbing over a 20-inch tub wall is fine at 35 and a real hazard at 75. A walk-in shower is aging-in-place insurance.
- Cleaning. Scrubbing a tub surround's caulk lines and soap scum is nobody's hobby. A tiled walk-in with a squeegee routine is far easier to keep clean.
- The room feels bigger. Glass instead of a shower curtain or tub wall opens up a small bathroom visually — sometimes dramatically.
The part nobody expects: the drain has to move
A tub drain sits at one end of the tub, tucked against the wall. A shower drain sits roughly in the centre of the shower floor (or along one edge with a linear drain). Those are not the same spot — not even close.
So the floor gets opened up and the drain line gets rerouted to the new location. On a main floor with a basement below, that's straightforward: I work from underneath. On a second floor or a slab, it means opening the floor itself. Either way, it's real plumbing work, and it's the reason a “simple” tub-to-shower swap is actually a shower rebuild.
The honest version: anyone who quotes you a tub-to-shower conversion without mentioning the drain move hasn't thought it through. Ask them where the new drain goes — the answer tells you everything about the quote.
What the job actually includes
- Tub and surround demolition. The tub comes out, the walls come down to the studs in the shower area.
- Drain relocation as described above, plus any supply-line adjustments.
- Valve. If your shower valve is old, this is the time — the walls are open and it'll never be cheaper to replace. I always recommend it.
- Waterproofing. The new shower gets a full waterproof system — I use Schluter throughout (there's a whole article on why I only use Schluter). Tiled base, walls, niche, bench if you want one.
- Tile. Floor, walls, niche, curb. You pick it all at wholesale through my suppliers.
- Glass. Measured after the tile is done — never before. Framed, semi-frameless, or frameless depending on your budget.
Curb or curbless?
A low curb (a few inches) is the standard: it keeps water in and costs nothing extra. Curbless — a true barrier-free entry with the shower floor flush to the bathroom floor — is the premium option and fantastic for accessibility.
But here's the straight talk: going curbless means recessing the shower base into the floor structure so the tile can slope to the drain without raising the shower floor. Whether your house allows that depends on your joists and what's below. Some homes do it easily; some would need structural work that isn't worth it. I'll tell you which one yours is when I see it — I won't sell you curbless and figure it out later.
What it costs and how long it takes
A tub-to-shower conversion is priced like what it is: a complete shower rebuild. The labour lands in the same range as a full shower renovation — the drain move and full re-tile are the cost drivers, not the tub removal (that's the easy part).
For a ballpark on your specific layout, run it through our cost estimator — and read the 2026 cost guide for the full breakdown of where the money goes. Timeline for the shower area itself is typically around a week once work starts.
The bottom line
If the tub's just taking up space, converting it is one of the highest-satisfaction renovations I do — clients use their new shower every single day, which is more than they can say for the tub. Just go in knowing it's a proper rebuild with a drain move at its heart, not a weekend swap. Done right, with real waterproofing and tile, it'll outlast all of us.