How our pricing works
Most contractors hand you one big number and you never really know what went where. We do it differently:
- You pay us for labour only. One detailed, line-item quote covers the full renovation work — demo, waterproofing, tile, plumbing and electrical rough-in and finish, paint, and cleanup. No mystery markup on materials.
- You buy fixtures at our wholesale pricing. Every client gets access to our preferred suppliers at contractor pricing — tile, vanities, faucets, toilets, shower glass, the works.
- You control the budget. Fixture costs, choices, and quality are in your hands. Want to splurge on the tile and save on the vanity? Your call. You see exactly what everything costs.
Why we work this way: when the contractor marks up your fixtures, you pay more and choose less. Labour-only with wholesale access means no hidden margins — and you get a better bathroom for the same money.
Typical costs in Winnipeg
Your total has two parts: our labour quote, plus your fixture and material budget at wholesale. Here’s what the two sides typically look like in 2026:
| Project type | Typical labour | Typical fixture budget |
|---|---|---|
| Cosmetic refresh Paint, vanity and toilet swap, faucets, mirror, lighting. No tile, no layout changes. | $4,000 – $8,000 | $2,000 – $5,000 |
| Standard full renovation Gut to studs, new tub or shower, floor and shower tile, vanity, toilet, fixtures, paint. | $10,000 – $16,000 | $5,000 – $12,000 |
| Master ensuite / custom Large-format tile, curbless or linear-drain shower, niche and bench, frameless glass, heated floor, premium fixtures. | $16,000 – $25,000+ | $12,000 – $25,000+ |
Estimates, not quotes. Every bathroom is different — the table is a planning aid. Your exact labour number comes from a detailed written quote after we see the space.
What drives the labour price
- Moving plumbing. The single biggest cost adder. Keeping the toilet, tub/shower, and vanity where they are keeps thousands in your pocket.
- Tile complexity. Large-format tile, mosaics, herringbone, niches, and benches take more hours than a straightforward layout — regardless of what the tile itself costs you.
- The shower build. An acrylic unit is the fastest install. A fully tiled shower with a Schluter waterproofing system, linear drain, and bench takes real time — and lasts.
- Electrical work. Heated floors, new circuits, pot lights, and fan upgrades mean added labour.
- Your house. Older Winnipeg homes — River Heights, Wolseley, St. Boniface — hide cast-iron drains, plaster walls, and forty years of “creative” previous repairs. A 10% contingency is smart money.
What drives your fixture budget
This side is entirely yours to steer — and wholesale pricing stretches it further:
- Tile: the widest range of anything in the bathroom. A ceramic that looks great at wholesale can cost a third of a designer porcelain at retail.
- Vanity and top: stock vanities vs. custom floating units with stone tops.
- Shower glass: framed vs. frameless is a four-figure decision.
- Faucets and fixtures: finish and brand matter more than most people expect — compare at wholesale before falling in love at a showroom.
Because you buy at our supplier pricing, the same budget buys a noticeably nicer bathroom than it would at retail. That’s the whole point of the model.
Winnipeg-specific notes
- Book ahead: reputable bathroom contractors here typically book 4–6 months out. If someone can start tomorrow, ask why.
- Winter is fine. Unlike exterior work, bathroom renovations happen year-round — winter slots sometimes open up when outdoor projects shut down.
- Condos: many Winnipeg condos require work-hour restrictions, elevator bookings, and proof of insurance. Sort it out before signing anything.
- Have fixtures on site before demo day. With a labour-only model, your materials are on your timeline — order early, because backorders stall jobs.
How to spend smart
- Keep the layout. Same plumbing locations, new everything else — the best dollar-for-dollar savings there is.
- Don’t cheap out on waterproofing. A Schluter/Kerdi or equivalent system costs more in labour up front. The most expensive shower is the one you renovate twice.
- Pick one splurge. A statement tile or a rainfall shower or heated floors — not all three — keeps the budget honest.
- Compare at wholesale, not retail. Bring your shortlist to our suppliers before deciding — the price gap surprises most people.
- Get the detailed written quote. A line-item scope protects both sides. If a quote is vague, the extras will find you later.
Frequently asked questions
Why labour-only instead of one all-in price?
Because all-in pricing hides the fixture markup — you pay more without knowing it, and the contractor picks your materials to protect their margin. Labour-only with wholesale access means you see every dollar and choose every fixture.
How long does a bathroom renovation take?
A standard full bathroom takes 7 to 10 working days once work starts. Custom tile, glass lead times, and fixture backorders can stretch that — another reason to order your fixtures early.
What if I find a fixture cheaper somewhere else?
Buy it. It’s your bathroom and your money — our supplier access is a benefit, not an obligation. Just make sure it’s on site before we need it.
What’s the cheapest way to update a bathroom?
Paint, a new vanity, modern faucets, a new mirror, and updated lighting can transform a bathroom for under $10,000 without touching tile or plumbing.
Get your exact labour number
Ranges are useful — a real quote is better. We’ll look at your space and give you a detailed, line-item labour quote, then walk you through wholesale fixture options.
Want a quick ballpark before the detailed quote? Try our cost estimator — six questions, instant numbers.
Request a Free Quoteor call 1-204-781-3911